Skip Navigation

Case Study

HealthcareNutex Health

Construction: Topeka ER & Hospital

Topeka, KS 17,700 SQ FT

Completed: July 01, 2020

      Nutex Health is a leading service provider and management firm in the Micro-hospital and Freestanding Emergency Room industry. Their Topeka ER & Hospital facility features eight emergency beds, six inpatient beds, a pharmacy and a suite of state-of-the-art advanced imaging, radiology and laboratory equipment.

      As with all healthcare facilities, precision control of the indoor air environment is all-important. All piping, from essential water services to medical gas, must be utterly reliable. Of course McElroy’s understands that this extremely high functionality must also be cost efficient.

      McElroy’s prefabrication expertise allowed for significant portions of the mechanical systems to be designed and quickly pre-built to very exacting standards. Using the latest Trimble technology everything was rapidly and precisely installed. Count on McElroy’s to provide the value engineering, project management, construction and maintenance that healthcare clients require to meet mission-critical function needs at minimum cost within demanding timeframes.

PROJECT HIGHLIGHTS

  • High-performance, zone-controlled HVAC systems
  • Trane Intellipak rooftop units with steam humidifiers
  • Certified medical gas systems
  • Healthcare and emergency plumbing and fixtures
  • Domestic water and waste systems and fixtures
  • Hydronic piping and equipment
  • Imaging equipment cooling systems
  • JCI controls system, design/install/program
  • Time- and cost-saving prefabrication
Back to Top